Sec. 14. In developing the plan, the commission shall determine the best method and manner of establishing flood control, giving consideration to the following:

(1) The reservoir method.

Terms Used In Indiana Code 14-30-4-14

(2) The channel improvement method.

(3) The levee method.

(4) Flood plain regulation.

(5) All nonstructural methods.

As added by P.L.35-2001, SEC.7.