Sec. 7. The bond or other surety furnished by the operator under section 5 of this chapter shall be released by the director when the operator completes the backfilling, regrading, and drainage control of a bonded area in accordance with the operator’s approved reclamation plan.

[Pre-1995 Recodification Citation: 13-4.1-6.5-7.]

As added by P.L.1-1995, SEC.27.