Every ditch owner shall construct and maintain a substantial headgate at the point where the water is diverted and shall construct a measuring device, of a design approved by the department of water resources, at the most practicable point for measuring and apportioning the water as determined by the department. The department may order the construction of the measuring device by the ditch owner, and if construction is not completed within twenty days after receipt of the order, the person in charge of the irrigation works, upon instructions from the department, shall refuse to deliver water to the ditch owner. The ditch owner may not take water from the irrigation works until the measuring device is constructed and the department approves the device. Measuring devices must be arranged so they can be locked in place, and when locked by the person in charge of the irrigation works or that person’s authorized agent, for the measurement or apportionment of water, other persons may not interfere with, disturb, or change the devices. The use of water through a measuring device that was interfered with, disturbed, or changed constitutes prima facie evidence the person benefited by the interference, disturbance, or change violated this section.

Terms Used In North Dakota Code 61-14-06

  • Evidence: Information presented in testimony or in documents that is used to persuade the fact finder (judge or jury) to decide the case for one side or the other.
  • Person: means an individual, organization, government, political subdivision, or government agency or instrumentality. See North Dakota Code 1-01-49