North Dakota Code 61-24.3-06 – Secondary transmission mains
Current as of: 2023 | Check for updates
|
Other versions
Secondary transmission mains shall be constructed as part of the southwest pipeline project, as provided in the engineering preliminary design final report for the southwest pipeline project, state water commission project no. 1736, dated September 1982, except as provided in section 61-24.3-03.
Terms Used In North Dakota Code 61-24.3-06
- State: when applied to the different parts of the United States, includes the District of Columbia and the territories. See North Dakota Code 1-01-49
