(A) If the owner or operator of a construction and demolition debris facility rejects a load of debris that has been accepted at the unloading zone of the facility because the load is not eligible for disposal at the facility under this chapter and rules adopted under it, including section 3714.081 of the Revised Code, the owner or operator shall notify the director of environmental protection or a board of health, as applicable, of the rejection of the load. The notification shall be made in accordance with rules adopted under section 3714.02 of the Revised Code and shall include the date and time that the load was rejected, the license plate number of the vehicle transporting the rejected load as well as an indication of the state of origin of the vehicle, the name of the transporter or shipper of the load, if ascertainable, and the reason for rejecting the load. After rejecting a load, the owner or operator shall give the transporter or shipper of the load, as applicable, instructions regarding the requirements of division (B) of this section. The instructions shall be on a form prescribed by the director.

Terms Used In Ohio Code 3714.083

  • Board of health: means the board of health of a city or general health district or the authority having the duties of a board of health in any city as authorized by section 3709. See Ohio Code 3714.01
  • Construction and demolition debris: includes particles and dust created during demolition activities. See Ohio Code 3714.01
  • Disposal: means the discharge, deposit, injection, dumping, spilling, leaking, emitting, or placing of any construction and demolition debris into or on any land or ground or surface water or into the air, except if the disposition or placement constitutes storage. See Ohio Code 3714.01
  • Facility: means any site, location, tract of land, installation, or building used for the disposal of construction and demolition debris. See Ohio Code 3714.01
  • state: means the state of Ohio. See Ohio Code 1.59

(B) A transporter or shipper of a load that has been rejected under division (A) of this section shall notify the director or board, as applicable, of the ultimate disposition of the load after the load’s rejection. The notification shall be made in accordance with rules adopted under section 3714.02 of the Revised Code and shall include the date and time that the load was ultimately disposed of after its rejection, the location of the disposal, and the name of the owner or operator of the facility that accepted the load for disposal.