Within a reasonable time after the construction of a railroad, or at any time when required by the public utilities commission, such railroad shall make and file with the commission a map and profile of such railroad, which shall be drawn on a scale, and certified and signed by the president or engineer of such railroad.

A railroad company which violates this section is subject to the forfeiture provided in section 4905.12 of the Revised Code.