(A) In an action brought against a contractor or subcontractor arising out of the construction of a dwelling, the claimant must, no later than ninety days before filing the action, serve a written notice of claim on the contractor. The notice of claim must contain the following:

(1) a statement that the claimant asserts a construction defect;

Terms Used In South Carolina Code 40-59-840

  • Action: means any civil lawsuit or action or arbitration proceeding for damages or indemnity asserting a claim for injury or loss to a dwelling or personal property caused by an alleged defect arising out of or related to the design, construction, condition, or sale of the dwelling or a remodel of a dwelling. See South Carolina Code 40-59-820
  • Claimant: means a homeowner, including a subsequent purchaser, who asserts a claim against a contractor, subcontractor, supplier, or design professional concerning a defect in the design, construction, condition, or sale of a dwelling or in the remodel of a dwelling. See South Carolina Code 40-59-820
  • Construction defect: means a deficiency in or a deficiency arising out of the design, specifications, surveying, planning, supervision, or observation of construction or construction of residential improvements that results from any of the following:

    (a) defective material, products, or components used in the construction of residential improvements;

    (b) violation of the applicable codes in effect at the time of construction of residential improvements;

    (c) failure of the design of residential improvements to meet the applicable professional standards of care at the time of governmental approval of the design of residential improvements; or

    (d) failure to construct residential improvements in accordance with accepted trade standards for good and workmanlike construction at the time of construction. See South Carolina Code 40-59-820
  • Dwelling: means a single-family house or duplex or a multifamily unit not to exceed sixteen units and not to exceed three stories in height, and which is intended for residential use. See South Carolina Code 40-59-820

(2) a description of the claim or claims in reasonable detail sufficient to determine the general nature of the construction defect; and

(3) a description of any results of the defect, if known.

The contractor or subcontractor shall advise the claimant within fifteen days of receipt of the claim if the construction defect is not sufficiently stated and shall request clarification.