Terms Used In Tennessee Code 59-8-210

  • Area affected: means the area of land from which overburden is to be or has been removed and upon which a spoil bank is to be or has been deposited. See Tennessee Code 59-8-202
  • Commissioner: means the commissioner of environment and conservation or the commissioner's designees. See Tennessee Code 59-8-202
  • Operation: means all of the premises, facilities, and equipment and the use thereof in the process of removing and exploring for minerals from a designated surface mine area. See Tennessee Code 59-8-202
  • Operator: means any person, partnership or corporation engaged in surface mining who removes or intends to remove more than two hundred fifty (250) tons of any mineral from the earth by surface mining within twelve (12) successive calendar months. See Tennessee Code 59-8-202
  • Provisions of this part: means the rules, regulations and orders issued by the commissioner pursuant to this part as well as the words of the sections themselves. See Tennessee Code 59-8-202
  • Reclamation: means the process of backfilling, grading and shaping of the disturbed land in the affected area, constructing water control facilities, the taking of measures to control current or future air, water or soil pollution, and the planting of vegetation, and other measures. See Tennessee Code 59-8-202
  • Remainder: An interest in property that takes effect in the future at a specified time or after the occurrence of some event, such as the death of a life tenant.

Within such time as the commissioner shall prescribe, the operator shall file with the commissioner an annual report and map under each permit, stating the number of acres of land affected by the operation, the extent of reclamation and revegetation accomplished by the operator, and such other information as the commissioner may reasonably require in carrying out the provisions of this part. If the report and the commissioner’s inspection of the area affected show that the operator has complied fully with this part, the commissioner shall approve the report and shall release the operator’s bond, or the remainder thereof if any portion has already been released under other provisions of this part. If the commissioner does not approve the report, the bond shall not be released until the operator corrects the deficiencies found by the commissioner.