Utah Code 63M-5-103. Definitions
Current as of: 2023 | Check for updates
|
Other versions
63M-5-103. Definitions.
As used in this chapter:
As used in this chapter:
(1) | “Commencement of construction” means any clearing of land, excavation, or construction but does not include preliminary site review, including soil tests, topographical surveys, exploratory drilling, boring or mining, or other preliminary tests. |
(2) | “Developer” means any person engaged or to be engaged in industrial development or the development or utilization of natural resources in this state through a natural resource or industrial facility, including owners, contract purchases of owners, and persons who, as a lessee or under an agreement, are engaged or to be engaged in industrial development or the development or utilization of natural resources in this state through a natural resource or industrial facility. |
(4) | “Natural resource facility” or “industrial facility” means any land, structure, building, plant, mine, road, installation, excavation, machinery, equipment, or device, or any addition to, reconstruction, replacement, or improvement of, land or an existing structure, building, plant, mine, road, installation, excavation, machinery, or device reasonably used, erected, constructed, acquired, or installed by any person, if a substantial purpose of or result of the use, erection, construction, acquisition, rental, lease, or installation is related to industrial development or the development or utilization of the natural resources in this state. |
(5) | “Person” includes any individual, firm, co-partnership, joint venture, corporation, estate, trust, business trust, syndicate, or any group or combination acting as a unit. |
(6) | “Unit of local government” means any county, municipality, school district, special district, special service district, or any other political subdivision of the state. |
Amended by Chapter 16, 2023 General Session