Utah Code 73-28-401. Analysis of benefits and costs — Allocation of costs
Current as of: 2024 | Check for updates
|
Other versions
(1) The board shall allocate project costs based on the economic costs and benefits of the developed water and electricity among the following water uses:
Terms Used In Utah Code 73-28-401
- Board: means the Board of Water Resources. See Utah Code 73-28-103
- Developed water: means surface water developed by the project. See Utah Code 73-28-103
- Project: means the Lake Powell Pipeline project and associated facilities, including:(9)(a)(i) facilities associated with environmental mitigation;(9)(a)(ii) hydroelectric generating works and incidental electrical facilities;(9)(a)(iii) pipelines; and(9)(a)(iv) pumping stations. See Utah Code 73-28-103
- Project costs: include preconstruction costs, construction costs, and project operation, maintenance, repair, and replacement costs. See Utah Code 73-28-103
- State: when applied to the different parts of the United States, includes a state, district, or territory of the United States. See Utah Code 68-3-12.5
(1)(a) municipal and industrial;(1)(b) electricity;(1)(c) public recreation; and(1)(d) fish and wildlife.
(2) The state shall pay the nonreimbursable project costs allocated to recreation and fish and wildlife.