A. A person shall not conduct any land-disturbing activity until he has submitted a permit application to the VSMP authority that includes a state VSMP permit registration statement, if such statement is required, and, after July 1, 2014, a stormwater management plan or an executed agreement in lieu of a stormwater management plan, and has obtained VSMP authority approval to begin land disturbance. A locality that is not a VSMP authority shall provide a general notice to applicants of the state permit coverage requirement and report all approvals pursuant to the Erosion and Sediment Control Law (§ 62.1-44.15:51 et seq.) to begin land disturbance of one acre or greater to the Department at least monthly. Upon the development of an online reporting system by the Department, but no later than July 1, 2014, a VSMP authority shall be required to obtain evidence of state VSMP permit coverage where it is required prior to providing approval to begin land disturbance. The VSMP authority shall act on any permit application within 60 days after it has been determined by the VSMP authority to be a complete application. The VSMP authority may either issue project approval or denial and shall provide written rationale for the denial. The VSMP authority shall act on any permit application that has been previously disapproved within 45 days after the application has been revised, resubmitted for approval, and deemed complete. Prior to issuance of any approval, the VSMP authority may also require an applicant, excluding state and federal entities, to submit a reasonable performance bond with surety, cash escrow, letter of credit, any combination thereof, or such other legal arrangement acceptable to the VSMP authority, to ensure that measures could be taken by the VSMP authority at the applicant’s expense should he fail, after proper notice, within the time specified to initiate or maintain appropriate actions that may be required of him by the permit conditions as a result of his land-disturbing activity. If the VSMP authority takes such action upon such failure by the applicant, the VSMP authority may collect from the applicant the difference should the amount of the reasonable cost of such action exceed the amount of the security held. Within 60 days of the completion of the requirements of the permit conditions, such bond, cash escrow, letter of credit, or other legal arrangement, or the unexpended or unobligated portion thereof, shall be refunded to the applicant or terminated. These requirements are in addition to all other provisions of law relating to the issuance of permits and are not intended to otherwise affect the requirements for such permits.

Terms Used In Virginia Code 62.1-44.15:34

  • Agreement in lieu of a stormwater management plan: means a contract between the VSMP authority and the owner or permittee that specifies methods that shall be implemented to comply with the requirements of a VSMP for the construction of a (i) single-family residence or (ii) farm building or structure on a parcel of land with a total impervious cover percentage, including the impervious cover from the farm building or structure to be constructed, of less than five percent; such contract may be executed by the VSMP authority in lieu of a stormwater management plan. See Virginia Code 62.1-44.15:24
  • Board: means the State Water Control Board. See Virginia Code 62.1-44.3
  • Bond with surety: includes the payment in cash of the full amount of the required bond and, in such case, no surety shall be required. See Virginia Code 1-205
  • Department: means the Department of Environmental Quality. See Virginia Code 62.1-44.15:24
  • Escrow: Money given to a third party to be held for payment until certain conditions are met.
  • Evidence: Information presented in testimony or in documents that is used to persuade the fact finder (judge or jury) to decide the case for one side or the other.
  • Includes: means includes, but not limited to. See Virginia Code 1-218
  • land-disturbing activity: means a man-made change to the land surface that potentially changes its runoff characteristics including clearing, grading, or excavation, except that the term shall not include those exemptions specified in § 62. See Virginia Code 62.1-44.15:24
  • Locality: means a county, city, or town as the context may require. See Virginia Code 1-221
  • Person: means an individual, corporation, partnership, association, governmental body, municipal corporation, or any other legal entity. See Virginia Code 62.1-44.3
  • Reclamation: means the treatment of domestic, municipal, or industrial wastewater or sewage to produce reclaimed water for a direct beneficial or controlled use that would not otherwise occur. See Virginia Code 62.1-44.3
  • Small construction activity: means :

    1. See Virginia Code 62.1-44.15:24

  • State: when applied to a part of the United States, includes any of the 50 states, the District of Columbia, the Commonwealth of Puerto Rico, Guam, the Northern Mariana Islands, and the United States Virgin Islands. See Virginia Code 1-245
  • State permit: means an approval to conduct a land-disturbing activity issued by the Board in the form of a state stormwater individual permit or coverage issued under a state general permit or an approval issued by the Board for stormwater discharges from an MS4. See Virginia Code 62.1-44.15:24
  • Stormwater: means precipitation that is discharged across the land surface or through conveyances to one or more waterways and that may include stormwater runoff, snow melt runoff, and surface runoff and drainage. See Virginia Code 62.1-44.15:24
  • Stormwater management plan: means a document containing material describing methods for complying with the requirements of a VSMP. See Virginia Code 62.1-44.15:24
  • VSMP: means a program approved by the Soil and Water Conservation Board after September 13, 2011, and until June 30, 2013, or the State Water Control Board on and after June 30, 2013, that has been established by a VSMP authority to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations. See Virginia Code 62.1-44.15:24
  • VSMP authority: means an authority approved by the Board after September 13, 2011, to operate a Virginia Stormwater Management Program or the Department. See Virginia Code 62.1-44.15:24

B. A Chesapeake Bay Preservation Act Land-Disturbing Activity shall be subject to coverage under the Virginia Stormwater Management Program (VSMP) General Permit for Discharges of Stormwater from Construction Activities until July 1, 2014, at which time it shall no longer be considered a small construction activity but shall be then regulated under the requirements of this article.

C. Notwithstanding any other provisions of this article, the following activities are exempt, unless otherwise required by federal law:

1. Permitted surface or deep mining operations and projects, or oil and gas operations and projects conducted under the provisions of Title 45.2;

2. Clearing of lands specifically for agricultural purposes and the management, tilling, planting, or harvesting of agricultural, horticultural, or forest crops, livestock feedlot operations, or as additionally set forth by the Board in regulations, including engineering operations as follows: construction of terraces, terrace outlets, check dams, desilting basins, dikes, ponds, ditches, strip cropping, lister furrowing, contour cultivating, contour furrowing, land drainage, and land irrigation; however, this exception shall not apply to harvesting of forest crops unless the area on which harvesting occurs is reforested artificially or naturally in accordance with the provisions of Chapter 11 (§ 10.1-1100 et seq.) or is converted to bona fide agricultural or improved pasture use as described in subsection B of § 10.1-1163;

3. Single-family residences separately built and disturbing less than one acre and not part of a larger common plan of development or sale, including additions or modifications to existing single-family detached residential structures. However, localities subject to the provisions of the Chesapeake Bay Preservation Act (§ 62.1-44.15:67 et seq.) may regulate these single-family residences where land disturbance exceeds 2,500 square feet;

4. Land-disturbing activities that disturb less than one acre of land area except for land-disturbing activity exceeding an area of 2,500 square feet in all areas of the jurisdictions designated as subject to the Chesapeake Bay Preservation Area Designation and Management Regulations adopted pursuant to the provisions of the Chesapeake Bay Preservation Act (§ 62.1-44.15:67 et seq.) or activities that are part of a larger common plan of development or sale that is one acre or greater of disturbance; however, the governing body of any locality that administers a VSMP may reduce this exception to a smaller area of disturbed land or qualify the conditions under which this exception shall apply;

5. Discharges to a sanitary sewer or a combined sewer system;

6. Activities under a state or federal reclamation program to return an abandoned property to an agricultural or open land use;

7. Routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original construction of the project. The paving of an existing road with a compacted or impervious surface and reestablishment of existing associated ditches and shoulders shall be deemed routine maintenance if performed in accordance with this subsection; and

8. Conducting land-disturbing activities in response to a public emergency where the related work requires immediate authorization to avoid imminent endangerment to human health or the environment. In such situations, the VSMP authority shall be advised of the disturbance within seven days of commencing the land-disturbing activity, and compliance with the administrative requirements of subsection A is required within 30 days of commencing the land-disturbing activity.

1989, cc. 467, 499, § 10.1-603.8; 1994, cc. 605, 898; 2004, c. 372; 2011, c. 400; 2012, cc. 785, 819; 2013, cc. 756, 793; 2014, cc. 303, 598.