A. The Board shall issue a Watershed General Virginia Pollutant Discharge Elimination System Permit, hereafter referred to as the general permit, authorizing point source discharges of total nitrogen and total phosphorus to the waters of the Chesapeake Bay and its tributaries. Except as otherwise provided in this article, the general permit shall control in lieu of technology-based, water quality-based, and best professional judgment, interim or final effluent limitations for total nitrogen and total phosphorus in individual Virginia Pollutant Discharge Elimination System permits for facilities covered by the general permit where the effluent limitations for total nitrogen and total phosphorus in the individual permits are based upon standards, criteria, waste load allocations, policy, or guidance established to restore or protect the water quality and beneficial uses of the Chesapeake Bay or its tidal tributaries.

Terms Used In Virginia Code 62.1-44.19:14

  • Association: means the Virginia Nutrient Credit Exchange Association authorized by this article. See Virginia Code 62.1-44.19:13
  • Board: means the State Water Control Board. See Virginia Code 62.1-44.3
  • Certificate: means any certificate issued by the Department. See Virginia Code 62.1-44.3
  • Deed: The legal instrument used to transfer title in real property from one person to another.
  • Delivery factor: means an estimate of the number of pounds of total nitrogen or total phosphorus delivered to tidal waters for every pound discharged from a permitted facility, as determined by the specific geographic location of the permitted facility, to account for attenuation that occurs during riverine transport between the permitted facility and tidal waters. See Virginia Code 62.1-44.19:13
  • Department: means the Department of Environmental Quality. See Virginia Code 62.1-44.19:13
  • ENRC Program: means the Phase III Watershed Implementation Plan Enhanced Nutrient Removal Certainty Program established pursuant to subsection G of § Virginia Code 62.1-44.19:13
  • Equivalent load: means 2,300 pounds per year of total nitrogen and 300 pounds per year of total phosphorus at a flow volume of 40,000 gallons per day; 5,700 pounds per year of total nitrogen and 760 pounds per year of total phosphorus at a flow volume of 100,000 gallons per day; and 28,500 pounds per year of total nitrogen and 3,800 pounds per year of total phosphorus at a flow volume of 500,000 gallons per day. See Virginia Code 62.1-44.19:13
  • Establishment: means any industrial establishment, mill, factory, tannery, paper or pulp mill, mine, coal mine, colliery, breaker or coal-processing operations, quarry, oil refinery, boat, vessel, and every other industry or plant or works the operation of which produces industrial wastes or other wastes or which may otherwise alter the physical, chemical or biological properties of any state waters. See Virginia Code 62.1-44.3
  • Facility: means a point source discharging or proposing to discharge total nitrogen or total phosphorus to the Chesapeake Bay or its tributaries. See Virginia Code 62.1-44.19:13
  • General permit: means the general permit authorized by this article. See Virginia Code 62.1-44.19:13
  • Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.
  • Owner: means the Commonwealth or any of its political subdivisions, including but not limited to sanitation district commissions and authorities and any public or private institution, corporation, association, firm, or company organized or existing under the laws of this or any other state or country, or any officer or agency of the United States, or any person or group of persons acting individually or as a group that owns, operates, charters, rents, or otherwise exercises control over or is responsible for any actual or potential discharge of sewage, industrial wastes, or other wastes to state waters, or any facility or operation that has the capability to alter the physical, chemical, or biological properties of state waters in contravention of § 62. See Virginia Code 62.1-44.3
  • Permitted facility: means a facility authorized by the general permit to discharge total nitrogen or total phosphorus. See Virginia Code 62.1-44.19:13
  • Regulation: means a regulation issued under § 62. See Virginia Code 62.1-44.3
  • Standards: means standards established under subdivisions (3a) and (3b) of § 62. See Virginia Code 62.1-44.3
  • treatment works: means any device or system used in the storage, treatment, disposal, or reclamation of sewage or combinations of sewage and industrial wastes, including but not limited to pumping, power, and other equipment, and appurtenances, and any works, including land, that are or will be (i) an integral part of the treatment process or (ii) used for the ultimate disposal of residues or effluent resulting from such treatment. See Virginia Code 62.1-44.3
  • Tributaries: means those river basins listed in the Chesapeake Bay TMDL and includes the Potomac, Rappahannock, York, and James River Basins, and the Eastern Shore, which encompasses the creeks and rivers of the Eastern Shore of Virginia that are west of Route 13 and drain into the Chesapeake Bay. See Virginia Code 62.1-44.19:13
  • Waste load allocation: means (i) the water quality-based annual mass load of total nitrogen or annual mass load of total phosphorus allocated to individual facilities pursuant to the Water Quality Management Planning Regulation (Virginia Code 62.1-44.19:13

B. This section shall not be construed to limit or otherwise affect the Board’s authority to establish and enforce more stringent water quality-based effluent limitations for total nitrogen or total phosphorus in individual permits where those limitations are necessary to protect local water quality. The exchange or acquisition of credits pursuant to this article shall not affect any requirement to comply with such local water quality-based limitations.

C. The general permit shall contain the following:

1. Waste load allocations for total nitrogen and total phosphorus for each permitted facility expressed as annual mass loads, including reduced waste load allocations where applicable under the ENRC Program. The allocations for each permitted facility shall reflect the applicable individual water quality-based total nitrogen and total phosphorus waste load allocations. An owner or operator of two or more facilities located in the same tributary may apply for and receive an aggregated waste load allocation for total nitrogen and an aggregated waste load allocation for total phosphorus for multiple facilities reflecting the total of the water quality-based total nitrogen and total phosphorus waste load allocations established for such facilities individually;

2. A schedule requiring compliance with the combined waste load allocations for each tributary as soon as possible taking into account (i) opportunities to minimize costs to the public or facility owners by phasing in the implementation of multiple projects; (ii) the availability of required services and skilled labor; (iii) the availability of funding from the Virginia Water Quality Improvement Fund as established in § 10.1-2128, the Virginia Water Facilities Revolving Fund as established in § 62.1-225, and other financing mechanisms; (iv) water quality conditions; and (v) other relevant factors. Following receipt of the compliance plans required by subdivision C 3, the Board shall reevaluate the schedule taking into account the information in the compliance plans and the factors in this subdivision, and may modify the schedule as appropriate;

3. A requirement that the permittees shall either individually or through the Association submit compliance plans to the Department for approval. The compliance plans shall contain, at a minimum, any capital projects and implementation schedules needed to achieve total nitrogen and phosphorus reductions sufficient to comply with the individual and combined waste load allocations of all the permittees in the tributary. The compliance plans may rely on the exchange of point source credits in accordance with this article, but not the acquisition of credits through payments authorized by § 62.1-44.19:18, to achieve compliance with the individual and combined waste load allocations in each tributary. The compliance plans shall be updated annually and submitted to the Department no later than February 1 of each year. The compliance plans due beginning February 1, 2023, shall address the requirements of the ENRC Program;

4. Such monitoring and reporting requirements as the Board deems necessary to carry out the provisions of this article;

5. A procedure that requires every owner or operator of a facility authorized by a Virginia Pollutant Discharge Elimination System permit to discharge 100,000 gallons or more per day, or an equivalent load, directly into tidal waters, or 500,000 gallons or more per day, or an equivalent load, directly into nontidal waters, to secure general permit coverage by filing a registration statement with the Department within a specified period after each effective date of the general permit. The procedure shall also require any owner or operator of a facility authorized by a Virginia Pollutant Discharge Elimination System permit to discharge 40,000 gallons or more per day, or an equivalent load, directly into tidal or nontidal waters to secure general permit coverage by filing a registration statement with the Department at the time he makes application with the Department for a new discharge or expansion that is subject to an offset or technology-based requirement in § 62.1-44.19:15, and thereafter within a specified period of time after each effective date of the general permit. The procedure shall also require any owner or operator of a facility with a discharge that is subject to an offset requirement in subdivision A 5 of § 62.1-44.19:15 to secure general permit coverage by filing a registration statement with the Department prior to commencing the discharge and thereafter within a specified period of time after each effective date of the general permit. The general permit shall provide that any facility authorized by a Virginia Pollutant Discharge Elimination System permit and not required by this subdivision to file a registration statement shall be deemed to be covered under the general permit at the time it is issued, and shall file a registration statement with the Department when required by this section. Owners or operators of facilities that are deemed to be permitted under this section shall have no other obligation under the general permit prior to filing a registration statement and securing coverage under the general permit based upon such registration statement;

6. A procedure for efficiently modifying the lists of facilities covered by the general permit where the modification does not change or otherwise alter any waste load allocation or delivery factor adopted pursuant to the Water Quality Management Planning Regulation (9VAC25-720) or its successor, or an applicable total maximum daily load. The procedure shall also provide for modifying or incorporating new waste load allocations or delivery factors, including the opportunity for public notice and comment on such modifications or incorporations; and

7. Such other conditions as the Board deems necessary to carry out the provisions of this chapter and § 402 of the federal Clean Water Act (33 U.S.C. § 1342).

D. 1. The Board shall (i) review during the year 2020 and every 10 years thereafter the basis for allocations granted in the Water Quality Management Planning Regulation (9VAC25-720) and (ii) as a result of such decennial reviews propose for inclusion in the Water Quality Management Planning Regulation (9VAC25-720) either the reallocation of unneeded allocations to other facilities registered under the general permit or the reservation of such allocations for future use.

2. For each decennial review, the Board shall determine whether a permitted facility has:

a. Changed the use of the facility in such a way as to make discharges unnecessary, ceased the discharge of nutrients, and become unlikely to resume such discharges in the foreseeable future; or

b. Changed the production processes employed in the facility in such a way as to render impossible, or significantly to diminish the likelihood of, the resumption of previous nutrient discharges.

3. Beginning in 2030, each review also shall consider the following factors for municipal wastewater facilities:

a. Substantial changes in the size or population of a service area;

b. Significant changes in land use resulting from adopted changes to zoning ordinances or comprehensive plans within a service area;

c. Significant establishment of conservation easements or other perpetual instruments that are associated with a deed and that restrict growth or development;

d. Constructed treatment facility capacity;

e. Significant changes in the understanding of the water chemistry or biology of receiving waters that would reasonably result in unused nutrient discharge allocations over an extended period of time;

f. Significant changes in treatment technologies that would reasonably result in unused nutrient discharge allocations over an extended period of time;

g. The ability of the permitted facility to accommodate projected growth under existing nutrient waste load allocations; and

h. Other similarly significant factors that the Board determines reasonably to affect the allocations granted.

The Board shall not reduce allocations based solely on voluntary improvements in nutrient removal technology.

E. The Board shall maintain and make available to the public a current listing, by tributary, of all permittees and permitted facilities under the general permit, together with each permitted facility’s total nitrogen and total phosphorus waste load allocations, and total nitrogen and total phosphorus delivery factors.

F. Except as otherwise provided in this article, in the event that there are conflicting or duplicative conditions contained in the general permit and an individual Virginia Pollutant Discharge Elimination System permit, the conditions in the general permit shall control.

G. The Board shall adopt amendments to the Water Quality Management Planning Regulation and modifications to Virginia Pollutant Discharge Elimination System permits or registration lists to establish and implement the Phase III Watershed Implementation Plan Enhanced Nutrient Removal Certainty Program (ENRC Program) as provided in this subsection. The ENRC Program shall consist of the following projects and the following waste load allocation reductions and their respective schedules for compliance.

1. Priority projects for additional nitrogen and phosphorus removal (schedule for compliance):

a PROJECT NAME DESCRIPTION (COMPLIANCE SCHEDULE)
a HRSD-Chesapeake/Elizabeth STP Consolidate into regional system and close treatment facility (1/1/2023)
b HRSD-Boat Harbor WWTP Convey by subaqueous crossing to Nansemond River WWTP for nutrient removal (1/1/2026)
c HRSD-Nansemond River WWTP Upgrade and expand with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032)
d HRSD-Nassawadox WWTP Convey to regional system for nutrient removal (1/1/2026)
e Fredericksburg WWTF Expand with nutrient removal technology of 3.0 mg/L total nitrogen and 0.22 mg/L total phosphorus (1/1/2026)
f Spotsylvania Co.-FMC WWTF Convey to Massaponax WWTF and close treatment facility (1/1/2026)
g Spotsylvania Co.-Massaponax WWTF Expand with nutrient removal technology of 4.0 mg/L total nitrogen and 0.30 mg/L total phosphorus to consolidate and close FMC WWTF (1/1/2026)
h Spotsylvania Co.-Thornburg STP Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen and 0.30 mg/L total phosphorus (1/1/2026)
i HRRSA-North River WWTP Phosphorus removal tertiary filtration upgrade (1/1/2026)
j South Central Wastewater Authority WWTF Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen and 0.30 mg/L total phosphorus (1/1/2026)
k HRSD-Williamsburg WWTP Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032)
l HRSD-VIP WWTP Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032)
m HRSD-James River WWTP Upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2028)
n HRSD-Army Base WWTP Convey to VIP WWTP for nutrient removal (1/1/2032) or upgrade with nutrient removal technology of 4.0 mg/L total nitrogen (1/1/2026) and 0.30 mg/L total phosphorus (1/1/2032)

Each priority project and the associated schedule of compliance shall be incorporated into the applicable Virginia Pollutant Discharge Elimination System permit or registration list. Each priority project facility shall be in compliance (i) by complying with applicable annual average total nitrogen and total phosphorus concentrations for compliance years 2026, 2028, and 2032; (ii) for the South Central Wastewater Authority WWTF, by implementing a phased construction program approved by the Department, and acquiring sufficient point source credits until its phased construction is completed as provided in this subsection; or (iii) only for a facility subject to an aggregated waste load allocation, by exercising the option of achieving an equivalent discharged load by the date set out in the schedule of compliance based on the applicable total nitrogen and total phosphorus annual average concentrations and actual annual flow treated without the acquisition and use of point source credits generated by permitted facilities not under common ownership. Noncompliance shall be enforceable in the same manner as any other condition of a Virginia Pollutant Discharge Elimination System permit.

The following requirements shall apply to the phased construction program to upgrade the South Central Wastewater Authority WWTF: (a) by August 1, 2023, the South Central Wastewater Authority (SCWWA) shall submit a phased construction program to the Department, which shall review and approve such program by September 1, 2023, or as soon as possible thereafter;(b) by December 31, 2023, or within 150 days of approval by the Department of the phased construction program, whichever is later, SCWWA shall commence construction of the initial phase of construction; (c) by February 1, 2024, and annually thereafter, SCWWA shall submit a progress report to the Department describing its progress toward completing the phased construction program; (d) within 30 days of substantial completion of each major phase of construction, SCWWA shall submit an application for a certificate to operate to the Department and promptly place the associated treatment units into operation; (e) the phased construction program for the SCWWA WWTF priority project shall be completed as soon as possible on the schedule approved by the Department but no later than January 1, 2030; and (f) for each compliance year during the phased construction program that the facility does not achieve the nutrient removal technology concentration specified in this subsection, the SCWWA WWTF shall be responsible for acquiring sufficient point source credits to comply with its total nitrogen and total phosphorus waste load allocations applicable to that compliance year.

2. Nitrogen waste load allocation reductions — HRSD-York River WWTP:

Reduce the total nitrogen waste load allocation for the HRSD-York River WWTP to 228,444 lbs/year effective January 1, 2026.

3. James River HRSD SWIFT nutrient upgrades:

Reduce total nitrogen waste load allocations for HRSD treatment works in the James River basin to the following allocations effective January 1, 2026:

a FACILITY NAME TOTAL NITROGEN WASTELOAD
b ALLOCATION
c (lbs/year)
d HRSD-Army Base WWTP 219,307
e HRSD-Boat Harbor STP 304,593
f HRSD-James River STP 243,674
g HRSD-VIP WWTP 487,348
h HRSD-Nansemond STP 365,511
i HRSD-Williamsburg STP 274,133

Reduce total phosphorus waste load allocations for HRSD treatment works in the James River basin to the following allocations effective January 1, 2026:

a FACILITY NAME TOTAL PHOSPHORUS WASTELOAD
b ALLOCATION
c (lbs/year)
d HRSD-Army Base WWTP 27,413
e HRSD-Boat Harbor STP 38,074
f HRSD-James River STP 30,459
g HRSD-VIP WWTP 60,919
h HRSD-Nansemond STP 45,689
i HRSD-Williamsburg STP 34,267

Reduce total phosphorus waste load allocations for HRSD treatment works in the James River basin to the following allocations effective January 1, 2030:

a FACILITY NAME TOTAL PHOSPHORUS WASTELOAD
a ALLOCATION
a (lbs/year)
a HRSD-Army Base WWTP 21,931
a HRSD-Boat Harbor STP 30,459
a HRSD-James River STP 24,367
a HRSD-VIP WWTP 48,735
a HRSD-Nansemond STP 36,551
a HRSD-Williamsburg STP 27,413

Reduce total phosphorus waste load allocations for HRSD treatment works in the James River basin to the following allocations effective January 1, 2032:

a FACILITY NAME TOTAL PHOSPHORUS WASTELOAD
b ALLOCATION
c (lbs/year)
d HRSD-Army Base WWTP 16,448
e HRSD-Boat Harbor STP 22,844
f HRSD-James River STP 18,276
g HRSD-VIP WWTP 36,551
h HRSD-Nansemond STP 27,413
i HRSD-Williamsburg STP 20,560

Transfer the total nitrogen (454,596 lbs/year) and total phosphorus (41,450 lbs/year) waste load allocations for the HRSD-Chesapeake/Elizabeth STP to the Nutrient Offset Fund effective January 1, 2026.

Transfer the total nitrogen (153,500 lbs/yr) and total phosphorous (17,437 lbs/yr) waste load allocations for the HRSD-J.H. Miles Facility consolidation to HRSD in accordance with the approved registration list December 21, 2015, transfer.

2005, cc. 708, 710; 2010, c. 288; 2017, c. 9; 2021, Sp. Sess. I, cc. 363, 364; 2022, cc. 127, 128; 2023, cc. 177, 178.