Terms Used In Wisconsin Statutes 82.35

  • Contract: A legal written agreement that becomes binding when signed.
  • Damages: Money paid by defendants to successful plaintiffs in civil cases to compensate the plaintiffs for their injuries.
  • Following: when used by way of reference to any statute section, means the section next following that in which the reference is made. See Wisconsin Statutes 990.01
  • Highway: includes all public ways and thoroughfares and all bridges upon the same. See Wisconsin Statutes 990.01
  • in writing: includes any representation of words, letters, symbols or figures. See Wisconsin Statutes 990.01
  • Land: includes lands, tenements and hereditaments and all rights thereto and interests therein. See Wisconsin Statutes 990.01
  • Town: may be construed to include cities, villages, wards or districts. See Wisconsin Statutes 990.01
  • Town board: means the town board of supervisors. See Wisconsin Statutes 990.01
   (1)    The town board, upon its own motion, may lay out and open temporary highways through any lands in the following situations:
      (a)    When any highway is practically impassable or dangerous to travel.
      (b)    When the town board considers it necessary to suspend travel on a highway or on any part of a highway due to construction, repair, or other reasons.
   (2)   
      (a)    The board may contract in writing with the owner or lessee of any land through which it proposes to lay out a temporary highway, as to the location of the highway, and the damages that the owner or lessee is to receive. The contract shall be filed with the town clerk.
      (b)    In the absence of a contract under par. (a), the board shall determine the location of the temporary highway and the award of damages. Unless an emergency exists, the board shall serve the landowner with notice of the location of the highway and the award of damages and shall provide the landowner with 48 hours to object. The town board shall file a written order with the town clerk specifying the location of the temporary highway and the damages awarded.
      (c)    The owner or occupant of any land occupied by a temporary highway may, at any time after it is opened and within 30 days after it is vacated or discontinued, apply to the town board to determine the owner’s or occupant’s damages.
   (3)   If a temporary highway is opened in connection with or on account of road or bridge construction, the damages agreed upon or awarded pursuant to this section may be treated as part of the construction cost and paid out of the construction funds.
   (4)   A temporary highway shall exist only so long as needed and shall be considered vacated and discontinued when the permanent highway is again opened for public travel.