No person shall demolish any structure or building without making suitable provision for the disposal of all accumulated materials. No person shall overload any part of the protective structures erected during the demolition operations by storage, materials or debris to an extent beyond the live load capacity. No person shall, during demolition operations, allow materials to accumulate which would, by their nature, upon removal, cause an excessive amount of dust, dirt or debris in the air, without suitably wetting down such accumulations with water, dehydrated lime or some similar agent.