24 CFR 58.55 – Notice of intent to prepare an EIS
Current as of: 2024 | Check for updates
|
Other versions
As soon as practicable after the responsible entity decides to prepare an EIS, it must publish a NOI/EIS, using the HUD recommended format and disseminate it in the same manner as required by 40 CFR parts 1500 through 1508.
