24 CFR 965.407 – Reevaluations of mastermeter systems
Current as of: 2024 | Check for updates
|
Other versions
Because of changes in the cost of utility services and the periodic changes in utility regulations, PHAs with mastermeter systems are required to reevaluate mastermeter systems without checkmeters by making benefit/cost analyses at least every 5 years. These analyses may be omitted under the conditions specified in § 965.406.