30 CFR 250.290 – What operations require approval of the Conceptual Plan?
Current as of: 2024 | Check for updates
|
Other versions
You may not complete any production well or install the subsea wellhead and well safety control system (often called the tree) before BSEE has approved the Conceptual Plan.