30 CFR 57.12028 – Testing grounding systems
Current as of: 2024 | Check for updates
|
Other versions
Continuity and resistance of grounding systems shall be tested immediately after installation, repair, and modification; and annually thereafter. A record of the resistance measured during the most recent test shall be made available on a request by the Secretary or his duly authorized representative.