30 CFR 75.215 – Longwall mining systems
Current as of: 2024 | Check for updates
|
Other versions
For each longwall mining section, the roof control plan shall specify—
(a) The methods that will be used to maintain a safe travelway out of the section through the tailgate side of the longwall; and
(b) The procedures that will be followed if a ground failure prevents travel out of the section through the tailgate side of the longwall.