30 CFR 75.509 – Electric power circuit and electric equipment; deenergization
Current as of: 2024 | Check for updates
|
Other versions
All power circuits and electric equipment shall be deenergized before work is done on such circuits and equipment, except when necessary for trouble shooting or testing.