§ 151.71 Applicability
§ 151.72 Incorporation by reference of technical guidelines in Advisory Circulars
§ 151.73 Land acquisition
§ 151.75 Preparation of site
§ 151.77 Runway paving: General rules
§ 151.79 Runway paving: Second runway; wind conditions
§ 151.80 Runway paving: Additional runway; other conditions
§ 151.81 Taxiway paving
§ 151.83 Aprons
§ 151.85 Special treatment areas
§ 151.86 Lighting and electrical work: General
§ 151.87 Lighting and electrical work: Standards
§ 151.89 Roads
§ 151.91 Removal of obstructions
§ 151.93 Buildings; utilities; sidewalks; parking areas; and landscaping
§ 151.95 Fences; distance markers; navigational and landing aids; and offsite work
§ 151.97 Maintenance and repair
§ 151.99 Modifications of programming standards

Terms Used In CFR > Title 14 > Chapter I > Subchapter I > Part 151 > Subpart C - Project Programming Standards

  • airport layout plan: means the basic plan for the layout of an eligible airport that shows, as a minimum—

    (1) The present boundaries of the airport and of the offsite areas that the sponsor owns or controls for airport purposes, and of their proposed additions;

    (2) The location and nature of existing and proposed airport facilities (such as runways, taxiways, aprons, terminal buildings, hangars, and roads) and of their proposed modifications and extensions; and

    (3) The location of existing and proposed non-aviation areas, and of their existing improvements. See 14 CFR 151.5

  • Evidence: Information presented in testimony or in documents that is used to persuade the fact finder (judge or jury) to decide the case for one side or the other.
  • Judgement: The official decision of a court finally determining the respective rights and claims of the parties to a suit.