(a) Congressional statement of policy

It is the policy of Congress that a project for waste treatment and management undertaken with Federal financial assistance under this chapter by any State, municipality, or intermunicipal or interstate agency shall be considered as an overall waste treatment system for waste treatment and management, and shall be that system which constitutes the most economical and cost-effective combination of devices and systems used in the storage, treatment, recycling, and reclamation of municipal sewage or industrial wastes of a liquid nature to implement section 1281 of this title, or necessary to recycle or reuse water at the most economical cost over the estimated life of the works, including intercepting sewers, outfall sewers, sewage collection systems, pumping power, and other equipment, and their appurtenances; extension, improvements, remodeling, additions, and alterations thereof; elements essential to provide a reliable recycled supply such as standby treatment units and clear well facilities; and any works, including site acquisition of the land that will be an integral part of the treatment process (including land use for the storage of treated wastewater in land treatment systems prior to land application) or which is used for ultimate disposal of residues resulting from such treatment; water efficiency measures and devices; and any other method or system for preventing, abating, reducing, storing, treating, separating, or disposing of municipal waste, including storm water runoff, or industrial waste, including waste in combined storm water and sanitary sewer systems; to meet the requirements of this chapter.

(b) Determination by Administrator as prerequisite to approval of grant

Terms Used In 33 USC 1298

  • construction: means any one or more of the following: preliminary planning to determine the feasibility of treatment works, engineering, architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings, specifications, procedures, field testing of innovative or alternative waste water treatment processes and techniques meeting guidelines promulgated under section 1314(d)(3) of this title, or other necessary actions, erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works, or the inspection or supervision of any of the foregoing items. See 33 USC 1292
  • interstate agency: means an agency of two or more States established by or pursuant to an agreement or compact approved by the Congress, or any other agency of two or more States, having substantial powers or duties pertaining to the control of pollution as determined and approved by the Administrator. See 33 USC 1362
  • municipality: means a city, town, borough, county, parish, district, association, or other public body created by or pursuant to State law and having jurisdiction over disposal of sewage, industrial wastes, or other wastes, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under section 1288 of this title. See 33 USC 1362
  • replacement: as used in this subchapter means those expenditures for obtaining and installing equipment, accessories, or appurtenances during the useful life of the treatment works necessary to maintain the capacity and performance for which such works are designed and constructed. See 33 USC 1292
  • State: means a State, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, the Commonwealth of the Northern Mariana Islands, and the Trust Territory of the Pacific Islands. See 33 USC 1362
  • treatment works: means any devices and systems used in the storage, treatment, recycling, and reclamation of municipal sewage or industrial wastes of a liquid nature to implement section 1281 of this title, or necessary to recycle or reuse water at the most economical cost over the estimated life of the works, including intercepting sewers, outfall sewers, sewage collection systems, pumping, power, and other equipment, and their appurtenances. See 33 USC 1292

In accordance with the policy set forth in subsection (a) of this section, before the Administrator approves any grant to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of any treatment works the Administrator shall determine that the facilities plan of which such treatment works are a part constitutes the most economical and cost-effective combination of treatment works over the life of the project to meet the requirements of this chapter, including, but not limited to, consideration of construction costs, operation, maintenance, and replacement costs.

(c) Value engineering review

In furtherance of the policy set forth in subsection (a) of this section, the Administrator shall require value engineering review in connection with any treatment works, prior to approval of any grant for the erection, building, acquisition, alteration, remodeling, improvement, or extension of such treatment works, in any case in which the cost of such erection, building, acquisition, alteration, remodeling, improvement, or extension is projected to be in excess of $10,000,000. For purposes of this subsection, the term “value engineering review” means a specialized cost control technique which uses a systematic and creative approach to identify and to focus on unnecessarily high cost in a project in order to arrive at a cost saving without sacrificing the reliability or efficiency of the project.

(d) Projects affected

This section applies to projects for waste treatment and management for which no treatment works including a facilities plan for such project have received Federal financial assistance for the preparation of construction plans and specifications under this chapter before December 29, 1981.