12 Guam Code Ann. § 8506
Current as of: 2023 | Check for updates
|
Other versions
GPA is authorized to immediately implement an interim, emergency net metering rate structure wherein Customer generators shall be entitled to receive immediate credit for one hundred percent (100%) of the power generation capacity based on the specifications of the generation equipment installed times the rate the Guam Power Authority currently charges the customer until such time that GPA submits a rate structure to the PUC for the net metering program and it is approved by the PUC. This interim rate shall be subject to PUC revocation at any time.
SOURCE: Added by P.L. 29-062:6 (Apr. 4, 2008).
———-
ARTICLE 6
VIRTUAL POWER PLANT PROGRAM SOURCE: Entire article added by P.L. 36-137:1 (Dec. 28, 2022).