Sec. 3. (a) As used in this chapter, “construction” means the physical work involved in the construction, reconstruction, improvement, maintenance, or extension of a pipeline project.
(1) The preparation of the construction site.
(b) The term includes the following:
Terms Used In Indiana Code 8-1-22.6-3
- construction: means the physical work involved in the construction, reconstruction, improvement, maintenance, or extension of a pipeline project. See Indiana Code 8-1-22.6-3
- pipeline: means a pipeline (as defined in Indiana Code 8-1-22.6-6
(2) Disassembling and removing a structure.
(3) Related work.