(1) A person shall not commence any excavation without first giving notice to every operator. An excavator‘s notice to the center shall be deemed notice to all operators. An excavator’s notice to operators shall be ineffective for purposes of this subsection unless given to the center. Notice to the center shall be given at least two full business days, but no more than ten business days, before commencing the excavation, except notice may be given more than ten business days in advance when the excavation is a road construction, widening, repair, or grading project provided for in sections 70-311 to 70-313 and 86-708 to 86-710. An excavator may commence work before the elapse of two full business days when (a) notice to the center has been given as provided by this subsection and (b) all the affected operators have notified the excavator that the location of all the affected operator’s underground facilities have been marked or that the operators have no underground facilities in the location of the proposed excavation.

Need help reviewing a real estate contract?
Have it reviewed by a lawyer, get answers to your questions and move forward with confidence.
Connect with a lawyer now

Terms Used In Nebraska Statutes 76-2321

  • Center: means a call center which shall have as its principal purpose the statewide receipt and dissemination to participating operators of information on a fair and uniform basis concerning intended excavations by excavators in areas where operators have underground facilities. See Nebraska Statutes 76-2305
  • Excavation: shall mean any activity in which earth, rock, or other material in or on the ground is moved or otherwise displaced by means of tools, equipment, or explosives and shall include grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, and cable or pipe plowing or driving but shall not include (1) normal maintenance of roads if the maintenance does not change the original road grade and does not involve the road ditch, (2) tilling of soil and gardening for seeding and other agricultural purposes, (3) digging of graves or in landfills in planned locations, (4) maintenance or rebuilding of railroad track or facilities located on a railroad right-of-way by the railroad company or its contractors when such maintenance or rebuilding does not change the track grade, or (5) hand digging around the base of a pole for pole inspection as part of routine maintenance or replacement of a pole when the replacement pole is similarly sized and is installed in the existing hole. See Nebraska Statutes 76-2308
  • Excavator: shall mean a person who engages in excavation in this state. See Nebraska Statutes 76-2309
  • Operator: shall mean a person who manages or controls the functions of an underground facility but shall not include a person who is an owner or tenant of real property where underground facilities are located if the underground facilities are used exclusively to furnish services or commodities on the real property. See Nebraska Statutes 76-2313
  • Person: means an individual, partnership, limited liability company, association, municipality, state, county, political subdivision, utility, joint venture, or corporation and shall include the employer, employee, or contractor of an individual. See Nebraska Statutes 76-2315

(2) The notice required pursuant to subsection (1) of this section shall include (a) the name and telephone number of the person making the notification, (b) the name, address, and telephone number of the excavator, (c) the location of the area of the proposed excavation, including the range, township, section, and quarter section, unless the area is within the corporate limits of a city or village, in which case the location may be by street address, (d) the date and time excavation is scheduled to commence, (e) the depth of excavation, (f) the type and extent of excavation being planned, including whether the excavation involves tunneling or horizontal boring, and (g) whether the use of explosives is anticipated.