1.    Before the initial entry upon the land for activities that do not disturb the surface, including inspections, staking, surveys, measurements, and general evaluation of proposed routes and sites for oil and gas drilling operations, the mineral developer shall provide at least seven days’ notice by registered mail or hand delivery to the surface owner unless waived by mutual agreement of both parties. The notice must include:

Terms Used In North Dakota Code 38-11.1-04.1

  • Damages: Money paid by defendants to successful plaintiffs in civil cases to compensate the plaintiffs for their injuries.
  • Jurisdiction: (1) The legal authority of a court to hear and decide a case. Concurrent jurisdiction exists when two courts have simultaneous responsibility for the same case. (2) The geographic area over which the court has authority to decide cases.
  • Lease: A contract transferring the use of property or occupancy of land, space, structures, or equipment in consideration of a payment (e.g., rent). Source: OCC
  • Property: includes property, real and personal. See North Dakota Code 1-01-49
  • written: include "typewriting" and "typewritten" and "printing" and "printed" except in the case of signatures and when the words are used by way of contrast to typewriting and printing. See North Dakota Code 1-01-37

a.    The name, address, telephone number, and, if available, the electronic mail address of the mineral developer or the mineral developer’s designee; b.    An offer to discuss and agree to consider accommodating any proposed changes to the proposed plan of work and oil and gas operations before commencement of oil and gas operations; and

c.    A sketch of the approximate location of the proposed drilling site.

2.    Except for exploration activities governed by chapter 38-08.1, the mineral developer shall give the surface owner written notice by registered mail or hand delivery of the oil and gas drilling operations contemplated at least twenty days before commencement of drilling operations unless mutually waived by agreement of both parties. If the mineral developer plans to commence drilling operations within twenty days of the termination date of the mineral lease, the required notice under this section may be given at any time before commencement of drilling operations. The notice must include:

a.    Sufficient disclosure of the plan of work and operations to enable the surface owner to evaluate the effect of drilling operations on the surface owner’s use of the property; b.    A plat map showing the location of the proposed well; and

c.    A form prepared by the director of the oil and gas division advising the surface owner of the surface owner’s rights and options under this chapter, including the right to request the department of environmental quality to inspect and monitor the well site for the presence of hydrogen sulfide.

3.    The notice required by this section must be given to the surface owner at the address shown by the records of the county treasurer’s office at the time the notice is given and     is deemed to have been received seven days after mailing by registered mail or immediately upon hand delivery.

4.    If a mineral developer fails to give notice as provided in this section, the surface owner may seek appropriate relief in the court of proper jurisdiction and may receive punitive as well as actual damages.