Bridges erected over drainage ditches shall, where necessary, be so constructed as to allow the superstructure to be removed for cleaning such ditches with as little damage in the removal to permanent parts of said bridge as practicable.

Source: SL 1919, ch 333, § 38; SDC 1939, § 28.1413.