The Board shall allocate, use, and distribute the proceeds of any bonds it is authorized to issue on or after July 1, 2007, pursuant to subdivision 10 of § 33.2-1701, as follows:

Terms Used In Virginia Code 33.2-365

  • Board: means the Commonwealth Transportation Board. See Virginia Code 33.2-100
  • Highway: means the entire width between the boundary lines of every way or place open to the use of the public for purposes of vehicular travel in the Commonwealth. See Virginia Code 33.2-100
  • State: includes District of Columbia;

    (f) "Transit facilities" means all real and personal property located in the Zone, necessary or useful in rendering transit service between points within the Zone, by means of rail, bus, water or air and any other mode of travel, including, without limitation, tracks, rights-of-way, bridges, tunnels, subways, rolling stock for rail, motor vehicle, marine and air transportation, stations, terminals and ports, areas for parking and all equipment, fixtures, buildings and structures and services incidental to or required in connection with the performance of transit service;

    (g) "Transit services" means the transportation of persons and their packages and baggage by means of transit facilities between points within the Zone including the transportation of newspapers, express and mail between such points, and charter service which originates within the Zone but does not include taxicab service or individual-ticket-sales sightseeing operations;

    (h) "Transit Zone" or "Zone" means the Washington Metropolitan Area Transit Zone created and described in Section 3 as well as any additional area that may be added pursuant to Section 83(a) of this Compact; and

    (i) "WMATC" means Washington Metropolitan Area Transit Commission. See Virginia Code 33.2-3100

1. A minimum of 20 percent of the bond proceeds shall be used for transit capital as further described in § 33.2-1526.2.

2. A minimum of 4.3 percent of the bond proceeds shall be used for rail capital consistent with the provisions of §§ 33.2-1526.2 and 33.2-1602.

3. The remaining amount of bond proceeds shall be used for paying the costs incurred or to be incurred for construction of transportation projects with such bond proceeds used or allocated as follows: (i) first, to match federal highway funds projected to be made available and allocated to highway and public transportation capital projects to the extent determined by the Board, for purposes of allowing additional state construction funds to be allocated pursuant to § 33.2-358; (ii) second, to provide any required funding to fulfill the Commonwealth’s allocation of equivalent revenue sharing matching funds pursuant to § 33.2-357 to the extent determined by the Board; and (iii) third, to pay or fund the costs of statewide or regional projects throughout the Commonwealth. Costs incurred or to be incurred for construction or funding of these transportation projects shall include environmental and engineering studies; rights-of-way acquisition; improvements to all modes of transportation; acquisition, construction, and related improvements; and any financing costs or other financing expenses relating to such bonds. Such costs may include the payment of interest on such bonds for a period during construction and not exceeding one year after completion of construction of the relevant project.

4. The total amount of bonds authorized shall be used for purposes of applying the percentages in subdivisions 1, 2, and 3.

2007, c. 896, § 33.1-23.4:01; 2011, cc. 830, 868; 2013, c. 639; 2014, c. 805; 2015, c. 684; 2020, cc. 1230, 1275.