Rhode Island General Laws 23-19.2-11. Percolation tests and ground water determinations
Current as of: 2023 | Check for updates
|
Other versions
Whenever a percolation test and/or ground water determination is required on any property within this state, the registered professional engineer or registered surveyor conducting the tests shall notify the city or town engineering department where the tests are to be taken, in writing, of the date and location of the tests, at least seven (7) days prior to the taking of the tests.
History of Section.
P.L. 1926, ch. 85, § 1; G.L. 1923, § 23-19-11; P.L. 1979, ch. 39, § 1; G.L. 1956, § 23-19.2-11.
Terms Used In Rhode Island General Laws 23-19.2-11
- in writing: include printing, engraving, lithographing, and photo-lithographing, and all other representations of words in letters of the usual form. See Rhode Island General Laws 43-3-16
- town: may be construed to include city; the words "town council" include city council; the words "town clerk" include city clerk; the words "ward clerk" include clerk of election district; the words "town treasurer" include city treasurer; and the words "town sergeant" include city sergeant. See Rhode Island General Laws 43-3-9