(a) “Structure” means any residential dwelling, other building, or improvement located upon a lot or within a common area.

(b) “Designed moisture barrier” means an installed moisture barrier specified in the plans and specifications, contract documents, or manufacturer’s recommendations.

Ask a real estate law question, get an answer ASAP!
Thousands of highly rated, verified real estate lawyers.
Specialties include: All Real Estate Law, Landlord and Tenant Law, Foreclosure, Homeowners' Association, Trespassing, Property Law, General Legal and more.
Click here to chat with a lawyer about your rights.

Terms Used In California Civil Code 895

  • Contract: A legal written agreement that becomes binding when signed.
  • Escrow: Money given to a third party to be held for payment until certain conditions are met.

(c) “Actual moisture barrier” means any component or material, actually installed, that serves to any degree as a barrier against moisture, whether or not intended as a barrier against moisture.

(d) “Unintended water” means water that passes beyond, around, or through a component or the material that is designed to prevent that passage.

(e) “Close of escrow” means the date of the close of escrow between the builder and the original homeowner. With respect to claims by an association, as defined in Section 4080, “close of escrow” means the date of substantial completion, as defined in Section 337.15 of the Code of Civil Procedure, or the date the builder relinquishes control over the association’s ability to decide whether to initiate a claim under this title, whichever is later.

(f) “Claimant” or “homeowner” includes the individual owners of single-family homes, individual unit owners of attached dwellings and, in the case of a common interest development, any association as defined in Section 4080.

(Amended by Stats. 2012, Ch. 181, Sec. 29. (AB 806) Effective January 1, 2013. Operative January 1, 2014, by Sec. 86 of Ch. 181.)