10 USC 2867 – Energy monitoring and utility control system specification for military construction and military family housing activities
(a)
(2) The energy monitoring and utility control system specification required by paragraph (1) shall cover the following:
(A) Utilities and energy usage, including electricity, gas, steam, and water usage.
(B) Indoor environments, including temperature and humidity levels.
(C) Heating, ventilation, and cooling components.
(D) Central plant equipment.
(E) Renewable energy generation systems.
(F) Lighting systems.
(G) Power distribution networks.
(b)
(2) The Secretary concerned may waive the application of the energy monitoring and utility control system specification required by subsection (a) with respect to a specific military construction project, military family housing activity, or other activity under this chapter if the Secretary determines that the application of the specification to the project or activity is not life cycle cost-effective. The Secretary concerned shall notify the congressional defense committees of any waiver granted under this paragraph.