Sec. 105. (a) The county surveyor representing a board from Indiana that is part of an interstate board shall work with the surveyor or engineer representing the officials of the other state in the performance of the duties required of the county surveyor by this chapter. The interstate board may employ an engineer to work with and assist the surveyor or surveyors, but an engineer may not be permanently employed unless the interstate board has determined that the proposed construction or reconstruction is necessary for the public health, welfare, or convenience, and that the cost of the construction or reconstruction will probably be less than the benefits to the affected land.

     (b) The surveyors and engineer, if one is employed, shall:

Terms Used In Indiana Code 36-9-27-105

  • Affected land: means land within a watershed that is affected by the construction, reconstruction, or maintenance of a regulated drain. See Indiana Code 36-9-27-2
  • Board: refers to the drainage board of a county. See Indiana Code 36-9-27-2
  • Damages: Money paid by defendants to successful plaintiffs in civil cases to compensate the plaintiffs for their injuries.
  • Reconstruction: means work on a drain as described in section 34(b) of this chapter to correct any of the problems with the drain that are enumerated in that section up to and including the discharge portion of the drain. See Indiana Code 36-9-27-2
(1) prepare all surveys, plans, specifications, and other things required by this chapter for construction or reconstruction solely within Indiana;

(2) estimate the total cost of the construction or reconstruction for the part of the drain located in each state, together with an estimate of the total cost of location; and

(3) in their report, make a fair and just apportionment between the two (2) states of the cost of location and construction or reconstruction.

The report shall be filed with the interstate board and, when that board adopts the report by proper resolution, a certified copy of the report shall be filed with the board in Indiana.

     (c) Upon receiving the report, the board in Indiana shall assess the benefits and damages to each tract of land affected in Indiana, in accordance with this chapter as applied to a drain located solely within Indiana.

     (d) All provisions of this chapter, including the giving of notices, the right to object and remonstrate, and the right to judicial review, apply to the board, the surveyor, and all affected persons.

     (e) When the construction or reconstruction is finally and conclusively established in both states, and when money is available in both states to pay for the proposed work, the interstate board shall meet and let the work contracts. Payment from funds in Indiana shall be made by voucher approved by the interstate board, countersigned by the chair of the board in Indiana, and filed with the county auditor. The payments shall be limited to the amount apportioned to Indiana under subsection (b).

[Pre-Local Government Recodification Citations: 19-4-9-4; 19-4-9-5; 19-4-9-6.]

As added by Acts 1981, P.L.309, SEC.101. Amended by P.L.127-2017, SEC.364.