No lien provided for in this chapter binds any saw logs, spars, piles or other timber, or lumber and shingles, for a longer period than eight calendar months after the claim as herein provided has been filed, unless a civil action be commenced in a proper court, within that time, to enforce the same: PROVIDED, HOWEVER, That in case such civil action so commenced should for any cause other than the merits, be nonsuited or dismissed, then the lien shall continue for the term of one calendar month, if the said eight months have expired, to permit the commencement of another action thereon, which shall be as effective in prolonging the lien as if it had been entered during the term of eight months hereinbefore stated.
[ 1893 c 132 § 10; RRS § 1171. Prior: Code 1881 § 1950; 1879 p 100 § 5; 1877 p 218 § 12.]

Need help reviewing a real estate contract?
Have it reviewed by a lawyer, get answers to your questions and move forward with confidence.
Connect with a lawyer now

Terms Used In Washington Code 60.24.110

  • Lien: A claim against real or personal property in satisfaction of a debt.
  • lumber: as used in this chapter , shall be held and be construed to mean all logs or other timber sawed or split for use, including beams, joists, planks, boards, shingles, laths, staves, hoops, and every article of whatsoever nature or description manufactured from saw logs or other timber. See Washington Code 60.24.030