33 CFR 117.5 – When the drawbridge must open
Current as of: 2024 | Check for updates
|
Other versions
Except as otherwise authorized or required by this part, drawbridges must open promptly and fully for the passage of vessels when a request or signal to open is given in accordance with this subpart.