79-8-201.  Definitions.
     As used in this part:

(1)  “Grant program” means the Recreation Restoration Infrastructure Grant Program created in Section 79-8-202.

Terms Used In Utah Code 79-8-201

  • Advisory committee: means the Utah Outdoor Recreation Infrastructure Advisory Committee created in Section 79-7-206. See Utah Code 79-8-102
  • Infrastructure grant: means an outdoor recreational infrastructure grant described in Section 79-8-401. See Utah Code 79-8-102
  • State: when applied to the different parts of the United States, includes a state, district, or territory of the United States. See Utah Code 68-3-12.5
(2)  “High demand outdoor recreation amenity” means infrastructure necessary for a campground, picnic area, or water recreation structure such as a dock, pier, or boat ramp that receives or has received heavy use by the public.

(3)  “High priority trail” means a motorized or nonmotorized recreation summer-use trail and related infrastructure that is prioritized by the advisory committee for restoration or rehabilitation to maintain usability and sustainability of trails that receive or have received high use by the public.

(4)  “Public lands” includes local, state, and federal lands.

(5)  “Rehabilitation or restoration” means returning an outdoor recreation structure or trail that has been degraded, damaged, or destroyed to its previously useful state by means of repair, modification, or alteration.

Amended by Chapter 68, 2022 General Session