(1)  To perfect the lien provided by this chapter, a notice of lien as required by Subsection 38-1a-502(2) shall be filed with the county recorder in any county where any part of the land to which the lien may attach is situated. The notice of lien shall be filed within 180 days after the last day work was performed or materials or equipment were furnished by the lien claimant, except as provided in Subsection (3).

Need help reviewing a real estate contract?
Have it reviewed by a lawyer, get answers to your questions and move forward with confidence.
Connect with a lawyer now

Terms Used In Utah Code 38-10-105

  • Contractor: means any person who, under contract with the owner or an operator designated by an owner, performs work upon or furnishes materials or equipment for any production unit. See Utah Code 38-10-101
  • Land: includes :Utah Code 68-3-12.5
  • Lien: A claim against real or personal property in satisfaction of a debt.
  • Lien claimant: means contractors and subcontractors who claim a lien under this chapter. See Utah Code 38-10-101
  • Owner: means a person holding any operating right, working interest, or interest in the legal or equitable title, to any real property, mine, oil lease, gas lease, well, or any combination of these, unless otherwise provided in this chapter. See Utah Code 38-10-101
(2)  Within 30 days after filing the notice of lien, the lien claimant shall deliver or mail a copy of the notice by certified mail, return receipt requested, to the owner of the interest liened. If the owner’s current address is not readily available, a copy of the notice may be mailed to the last-known address of the owner, as shown by the records of the county recorder in any county where the land is situated. Failure to deliver or mail the notice of lien to the owner shall not cause the lien to be void but precludes the lien claimant from an award of costs and attorney fees against the owner in an action to enforce the lien.

(3)  The notice of lien by a nonoperating owner pursuant to Subsection 38-10-102(3) shall be filed within 60 days after receipt by such owner of a notice of lien claim filed by a lien claimant with respect to work performed or materials or equipment furnished by the lien claimant for which such owner has paid or advanced funds to a contractor or operator.