Utah Code 38-1a-302. Land covered by lien — Multiple lots occupied by improvement — What a lien attaches to
Current as of: 2023 | Check for updates
|
Other versions
(1) | A preconstruction or construction lien extends to and covers as much of the land on which the improvement is made as necessary for the convenient use and occupation of the land. |
(a) | a building, infrastructure, utility, or other human-made structure or object constructed on or for and affixed to real property; or |
(b) | a repair, modification, or alteration of a building, infrastructure, utility, or object referred to in Subsection (21)(a). See Utah Code 38-1a-102 |
(2) | If an improvement occupies two or more lots or other subdivisions of land, the lots or subdivisions are considered as one for the purposes of this chapter. |
(3) | A preconstruction or construction lien attaches to all franchises, privileges, appurtenances, machinery, and fixtures pertaining to or used in connection with the improvement. |
Renumbered and Amended by Chapter 278, 2012 General Session